Tarriff Application
India's Largest Hydro-Power plant in the private sector
Baspa II > Technical Information
Search
Hydrology
River Baspa, a tributary of the river Sutluj, originates from Baspa Bamak Glacier of great Himalayan ranges at an elevation of 5800 m and flows mostly in a North-Westerly direction.
Catchment area at barrage axis 967.72 sq.km
Snow catchment 514.15 sq.km
Design flood (1 in 100 Years) 1150cumec
Diversion Barrage
Type Gated, 61 m long ( 4 bays of 13 m each & 3 piers of 3 m each)
Intake
Crest level El. 2525.0
No. of intake bays 4 bays each 4m wide
Sedimentation Chambers and Flushing Ducts
Particle Size to be Excluded (+) 0.20 mm
Desilting tanks 2Nos.
Size of tank 138.5 m (L)x 17m(W)x11m(H)
Head Race Tunnel (HRT)
Length 7950 m (excluding 103m of cut and cover portion)
Type of Section 4m dia, Modified Horse Shoe
Lining Concrete lining
Surge Shaft
Type Underground
Diameter 6 m / 8 m
Height 121 m
Pressure Shaft
No. & Type 1 no., steel lined 3.1m dia; 885m long with 1.8m dia unit bifurcations U/S of Power House
Power House
Capacity 3 x 100 MW
Type Underground
Size of P.H. Cavern 92 m (L) x 18m (W) x 39 m (H)
Size of Transformer Cavern 75 m (L) x 13m (W) x 20 m (H)
Generation
213 Million Units in 90% dependable year.
1391.61 Million Units per annum in 50% dependable year
Tail Race Tunnel (TRT) and Unit TRT’S
Length and Shape 475 m long, 5.6 m/ 3.6 m, D shaped
Hydraulic Turbines (HYDRO-VEVEYSA, SWITZERLAND)
Type Pelton
Design Head 702 m
Net Head 677.2 m to 712 m
Rated Output 103 MW
Inlet Valve Spherical Valve, 1.5 m Dia.
Generators (SIEMENS A.G., GERMANY)
Rated Output 111.11 MVA with 10% overload margin with higher temperature rise
Rated Voltage 13.8 kV +/- 5%
Frequency 50 Hz +/- 3%
Synchronous speed 375 rpm
Main Unit Transformers (BHEL)
No. & Capacity 3x41 MVA, Single phase for each unit
56.7 KM LONG, 400 KV D/C TRANSMISSION LINE BETWEEN BASPA-II TO JHAKRI